Lighting Control
Lighting Control System in a major attraction in Tokyo.
Cabinets Assembly
Cabinets are being assembled in France. They will soon control the lighting of a major attraction.
OBA Tuning
Sound system is adjusted on Warner Park "Gotham City Escape" in Spain.
Field Installation
Loudspeaker is inspected after its installation.
On Board Audio Tuning
Movie Park Germany "Studio Tour" coaster vehicles are prepared for Sound Tuning.
Show Programming
Preshow being programmed at FujiQ in Japan.
Custom LED screen
Field technician Benjamin Delhoume installs custom modules on a large LED screen.
Sound System Tuning
Advanced acoustic measurement tools used to fine-tune the sound system for a major attraction in Paris.
Splash-o-Saure
The Parc du Bocasse attraction features special effects and an original soundtrack.
Legoland Korea getting ready
Coordinator Jungmi Kim communicates with the team before Legoland Korea's grand opening.
On-Board system Tuning
Engineer Mayumi Saegusa checks FujiQ's Zokkon train sound system.
Soundtrack Mix
Maestro Patrice Peyrieras and Engineer Michel Biettmann reflect on sound mixing strategy in Korea.
Zokkon Coaster
FujiQ's Zokkon Coaster features a unique on-board sound and lighting system.
BGM sound mixing
"Mixing Cart" used at Legoland Korea to mix Area BGM.
Lighting Programming
Lighting programming takes place at night at Madame Tussauds Tokyo.
Site wiring
Engineer Michel Biettmann connects fiber optic wires in a major attraction in Hong Kong.
Live Show Installation
Installation Technician Gaku Uchida works on stage lighting system at Legoland Japan.
Cabinet Wiring
In Paris, wiring specialist Gérard Delzanno prepares cabinets for a major attraction.
Lighting Design
The preshow room of the Namazu coaster at Vulcania features a vibrating floor and intricate lighting.